Stand Technical Fact Sheet
The main challenge was to keep up the date for the installation of an arch made of Zebrano melaminated boards, as a draft shield.
It’s been a construction game made of wood and glass, installed at a great height : neon signs, large ceilings and arches. The result is an interplay of spaces with interrupted arches.
The main challenge was to keep up the date for the installation of an arch made of Zebrano melaminated boards, as a draft shield.
A wall of images dominates the site and the reception area is limited by a glass panel.
Computer cabling installed in the furniture with the introduction of video connections.
The arch is a large claustra – 5 m high and 4 m long – It’s a cluster system that stack together one upon another.
Assembly of miter joints and by simple emboitement.
The connecting bridge was slung with 9 holes to meet the challenge of the great heights.
The challenge was here to deal with the large sizes and the huge elements that were to be assembled on the spot.
Consequently, the stand fitters’ job had a main role for the stand to be perfectly achieved.